We are excited to announce the preparatory phase of our new LPG Plant in Kano, strategically located at Plot Par B, Kano-Zaria Road, Kadawa, Kura Local Government Area, directly opposite the Dangote Tomato Processing Company. This upcoming Plant is poised to play a pivotal role in improving LPG supply and clean energy access across the North West region

Pre-Construction Activities and Development Readiness
Significant groundwork has been laid ahead of the commencement of construction, ensuring a smooth transition into the development phase:
🔧 Land Use and Civil Works Preparation
- Construction Start Date: Site works are scheduled to commence shortly
- Site Area: The plant will cover approximately 16,000 square meters, with dedicated infrastructure for bulk offloading, bottling, and dispensing to end users
🛠️ Mechanical and Electrical Equipment Already Delivered
- Three high-capacity LPG tanks (60MT each) have already been delivered to site
- All mechanical equipment, including automated filling systems, piping, and electrical components, have been acquired and will be available for installation as civil works progress
Technical Highlights
- Total Storage Capacity: 180MT (180,000kg)
- Bottling Line Capacity: Capable of processing up to 180,000kg per day (equivalent to 14,400 12.5kg cylinders), scalable based on regional demand
- Filling System: Advanced automated filling lines with integrated flow control systems
- Distribution Facilities: Equipped with bulk LPG loading bays for commercial and industrial clients
and accelerate clean energy adoption across Nigeria.
Strategic Impact
- Energy Accessibility: Will help reduce the LPG supply gap in Northern Nigeria
- Environmental Benefits: Supports cleaner cooking and industrial processes, reducing reliance on firewood and kerosene
- Economic Growth: The project will generate jobs, stimulate local economies, and contribute to national energy security
As we prepare to break ground in the coming months, this project reflects our continued commitment to building resilient and sustainable energy systems across the country.
Watch this space for regular updates as we move into the construction phase of the Kano LPG Plant.
A cleaner energy future starts here!
